Home  |  Contact Us
 

Metro Vancouver Projects

  • The fact sheet was previously geared towards Port Moody, but it is our belief that the information it contains is of interest for any future project(s) in Metro Vancouver.
 

Fact Sheet: A 400 Tonne per Day Plasco Facility

The Proposed Facility

150,000 tonnes of residual waste processed per year (400 tonnes-per-day)

21 MW of net electricity delivered to B.C. Hydro within the Lower Mainland distribution grid

A commercial Plasco Energy Group Inc. facility with the world’s best environmental performance and highest energy recovery from waste conversion

A solution that enables waste to be managed within the Metro Vancouver region

What is the Cost to the Region?

No capital expenditures

No operating expenditures

Tipping fee comparable to that of landfill

What is the Environmental Performance?

No emissions from the conversion of garbage to synthetic fuel gas, construction aggregate, salt, sulphur and clean water

Exhaust emissions from engines running on the Plasco synthetic fuel gas are below the most stringent limits anywhere in the world and are disclosed publicly on a website

Heavy metals in the waste stream are recovered and sent for safe disposal (less than 2 kg for each tonne of waste processed)

Net decrease in air pollutants such as NOx as a result of reduced trucking, displacement of natural gas power, and reduced emissions from landfill.

 

Chart: Air Quality

Performance Chart